Federal University of Agriculture & Development Studies, Iragbiji

FUADSI Community

Browse

Now showing 6521 - 6530 of 41426

593.pdf  

2011-11-23
The aim of this project is to design and construct a direct -on- line stater using a logic circuit to serve as an extra protective device to electric motor.

HAYATU MAHMUD  

- HND

DESIGN AND CONSTRUCTION OF AN SCHMITT- TRIGGER LIGHT ALARM  

2011-11-23
This project is on the design and construction of an schmitt-trigger light alarm.

SAMUEL T. SAAWUA  

- OND

ROLES OF GUIDANCE COUNSELLING IN IMPROVING STUDENTS ACADEMIC PERFORMANCE IN PRIMARY SCHOOLS IN ONELGA (A CASE STUDY OF SOME SELECTED SCHOOLS IN ONELGA)  

2011-11-23
The purpose of this study arised as a result of the drastic fall in academic perfonnance of pupils in Ogba/Egbema/Ndoni Local Government Area. In other words, this research work is ...

ONITA VICTORYA.  

- NCE

AN EVALUATION OF THE PREVALENCE OF INDISCIPLINE IN PUBLIC PRIMARY SCHOOLS; A CASE STUDY PUBLIC PRIMARY STUDY OF SOME SELECTED SCHOOLS IN GIREI LOCAL GOVERNMENT AREA OF ADAMAWA STATE.  

2011-11-23
This research study attempted to evaluate the prevalence of indiscipline in public primary schools in Adamawa state, with particular reference to some selected public primary schools in Girei Local Government ...

BENSON DIMSHI  

- HND

DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH.  

2011-11-24
This project present the design and construction of a single phase automatic change over from standby power to public mains supply. Useful insight on the uses of these features is ...

SUNDAY FASHOLA AHMED  

- OND

DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH  

2011-11-24
The project present the design and construction of a single phase automatic change over from standby power to public mains supply useful insight on the uses of these features is ...

ABDULHAMID BELLO  

- OND

DESIGN AND CONSTRUCTION OF AN AUTOMATIC ELECTRONIC SCHOOL BELL  

2011-11-24
This project is designed to control the ringing of a bell automatically. It uses the elementary theories in the designed and construction of a device to carry out the monumental ...

ZUBAIRU MU'AZU  

- HND

ELECTRICAL INSTALLATION OF TWO BEDROOM FLAT  

2011-11-24
Electrical installation in two (2) bedroom flat. It show the design of light point and the socket in each room of he flat which shows the lumed of calculation has ...

JERRY UMAR  

- OND

ANALYSIS OF THE EFFECTIVENESS OF STRATEGIC PLANNING AND CONTROL ON CORPORATE PROFITABILITY IN ZENITH BANK PLC  

2011-11-24
This research was carried out to establish the effect of strategic planning and control on corporate profitability

WABLA DAHIRU  

- Masters

MODIFICATION OF THE ELECTRICAL INSTALLATION OF EEET DEPARTMENT OFFICE BLOCKS  

2011-11-24
This project is concerned with the modification of Electrical Installation of EEET department office Blocks. The main purpose of this project is to give light to the Department even when ...

ABDURRAHMAN RABIU ABUBAKAR  

- OND